◆ What are the precautions for installing the material level switch?
Answer: 1. Before installation, please confirm whether the power supply voltage is consistent with the voltage on the logo.
2. Try to avoid the feed opening when installing. When it cannot be avoided, a protective baffle can be installed to reduce the impact of materials during the unloading process.
3. It is recommended to install with an inclination of 15~30° horizontally downward to reduce material impact.
4. The cable inlet of the junction box faces downward, and the cable outlet fixing nut must be locked to prevent liquid from entering the junction box along the cable.
5. The load of the controlled line must comply with the switch contact capacity.
6. Avoid installing vibration motors and other products around the material level switch.